ENUGU STATE:

1. Making of First International Airport in Igboland: Rehabilitation of the Enugu Airport (New international airport Terminal).

2.Construction of the Ongoing Nsukka – Ayangba 132kv Double – Circuit
3. Sure – P Projects on Primary Health Care (PHC).

4. Reinvention of the cheapest & Fast means of transport(RAIL) Enugu – PH – Maiduguri Rail network now functioning. A reduction in road accident.

5. Upgrading of University of Nigeria Teaching Hospital(UNTH) Enugu to be at par with Lagos State University Teaching hospital an other premier teaching hospitals with new imported facilities to commence open – heart surgeries.

6. Approved for Rehabilitation of Enugu – Port Harcourt Road.

7. Formaling opening new route to connect Anambra to Abuja within a short distance through Ogrute – Umuida Road and Unadu to Odoru in Kogi State.

8. Rehabilitation of Umuna – Ndiagu and Ebenebe Ezeagu Road, Agubuogu through Ebenebe to Iwolo road.

9. $2.57 Billion Dam Project in Adada River Dam to provide Portable Water, Electricity and Irrigation for agriculture activities.

10. Federal Government finance of Ada Rice Irrigation Project at Uzo – Uwani- a first time a sitting President will give incentives to the rice mill.

11. Erosion control project- Producing a special ecoogical fund which Anambra State is chief beneficiary.

12. Export Crop preservation and Conditioning Centre in Enugu State (One of the 10 constructed nationwide ).

13.e – wallet System in the distribution of agricultural inputs to the farmers and Dry Season Farming Project.

14. Construction of Irrigation Facilities in Amagunze Rice Product farm Enugu, the first time a federal government will building its presence there.

15.Establishment of Enugu State office of the National Productivity Centre.

16. In 2012, FG Commissioned a Cultural Industry Centre in Inyi Enugu State.

17.Reinstatement of washout at Km 6 + 750, Km 30 + 400 and Km 35 + 325 along Onitsha- Enugu Dual – Carriage way in Anambra and Enugu State.

18. Establishment of Maritime Institute at University of Nigeria Nsukka.

EBONYI STATE:

19.Establishment of a Federal University in Ndufe – Alike in Ebonyi State to help improve quality of education in Ebonyi State.

20.Rehabilitation of 43 KM Obiozara – Uburu – Ishiagu Road 37Km Oji – Achi Obeagu – Maku – Awgu – Ndeabor – Mpu – Okpanku – Akaeze Road rehabilitation.

21.Construction of a Storey Hostel, Class room building and Procurement at the Federal Government Girls College Ezembo, Ebonyi State.

22.Sure – P Projects on Primary Health Centres and others.
23.Rehabilitation of Abakaliki – Mbok Road.

24.Establishment of a New Teaching Hospital.

25.e – wallet system for the Distribution of Agricultural Inputs to the farmers and Dry Season Farming Project.

26.Ongoing 2x 60MVA, 132/33KV Substation at Amasiri and 2 x 13KV Substation at Abakaliki and Abakaliki – Amasiri 132KV Double – Circuit Line.

27.Rehabilitation of Agricultural – Skills Training Centre.

28.Establishment of National Obstetric Fistula Centre Abakiliki

ANAMBRA STATE:

29. Building of Aircraft Maintenance School at Akili – Ozuzo, Ogbaru Local Government Area.

30.Construction of Federal Government Secretariat in Awka.

31.Exploring Public Private Partnership to Reconstruct Second Niger Bridge (Anambra – Delta States).


32.FGN Funded Ecological Projects in Anambra State : Nanka/Oko Landslide Project, the Nkisi Water Works.

33.Erosion Control/Dredging Projects in Onitsha, the Okpolo/Ire Ojoto Erosion Control Project, Alor Town.

34.Flood Control and Road Improvement Projects in Idemili Local Government Area.

35.Rehabilitation & completion of Onitsha – Owerri Road to Okija – Ihembosi – Afor – Ukpor – Ebenator – Ezenifite.

36.Onitsha River Port – Fixed and ready.

37.National Transmission Grid installed between Benin and Onitsha to prevent usual Nationwide Grid collapse.

38.Sure – P Projects on Primary Health Care & Transformation.

39.e – Wallet System in the distribution of agricultural inputs to the farmers and Dry Season Farming.

40.Ongoing Nnewi 2 x 60MVA, 132/33KV Substation 2 x 60MVA, 132/33KV Substation at Oba and 2 x 132KV.

41.Line Bays Extension at Nnewi, 2 x 60MVA, 132/33KV.

42.Substation at Mpu with 2 x 60KV Line Bays Extension at Nnenwe.

43.Onitsha – Oba – Nnewi – Ideato – Okigwe 132KV.

44.Double – Circuit Line, Ugwuaji Nnenwe 132KV Double – Circuit Line 2 x 60MVA,132/33KV Substation at Nnenwe.


45.Nnenwe – Mpu 132KV Double – Circuit Transmission Line, Onitsha – Ifitedunu and 2 x 132KV Double – Circuit Transmission Line, 2 x 60MVA, 132/33KV Substation at Ifitedunu and 2 x 132KV Line Bays Extension at Onitsha.

46.Modernisation of Nnamdi Azikwe University Teaching Hospital Nnewi

IMO STATE:

47.NDDC Projects: St Marks Estate and Federal Housing Estate Internal Road, New Owerri Ejizie – Izuogu Road in Akeme community of Arondizogu, and the Solar Powered Water Project at Mbaoma in Owerri North & Owerri Urban Water Scheme Project, Rehabilitation of Opkpuala – Iguruta Road(Imo and Rivers States), Reconstruction of Elele – Owerri Road.

48.Sea – Port and Naval Base Project in Osse – Motor.

49.Community (World Bank /FGN/Imo state) sponsored project.

50.Construction of Administrative Complex and Entrepreneurial Studies Complex in Federal University of Technology Owerri (FUTO).

51.Construction of the new Federal High Court Owerri division complex.

52.Establishment and Construction of a Court of Appeal Division in Owerri.

53.14Km Mbaise – Ngwa Road with a bridge at Imo/ Abia State (Cost ?2.94Billoin).

54.SURE – P Project on Primary Health Centres and other projects

55.Rehabilitation of Owerri – Port Harcourt Road

56.Ecological Control Projects at Nekede, Saint Kzito Secondary School in Muchina and the Umuoza – Ugri Erosion Control.

57.Rehabilitation of the Sam Mbakwe International Airport Owerri

58.Egbema Power Plant (338MW)

59.e-wallet System in distribution of the agricultural inputs to the Farmers and Dry Season Farming Project

60.Ongoing Mbalano 2 x 30/40MVA, 132/33KV Substation and Okigwe 2 x 30/40MVA , 132/133KV Substation

61.Dualisation of Ada Owerri – Ikot – Ekpene Border Section Phase one in Imo, Abia and Akwa –Ibom States.

62.Construction of Oguta River Port in Imo State.

63.Completion of Alaoji Power Plant (1074MW).

64.SURE – Projects on Primary Health Care (PHC) and others.

65.MDG Projects ( in partnership with the state Government) 250 Health Centres and 10 Solar Powered.

66.Water Boreholes completed and commissioned.

ABIA STATE

67.Rehabilitation of the Federal Roads: Mbaise – Ngwa Road with a bridge and Owerri – Aba Road

68.504MW Power Plant at Aba and 133KVA Substation in Umuahia (Under the Federal Government/Abia state Partnership Projects).

69.e – wallet system in the distribution of Agricultural Inputs to the farmers and Dry Season farming projects.

70.Umuahia – Mbalano 132KV Line.

71.Mbalano 2 x 30/40MVA, 132/33KV Substation.

72.Ohafia 2 x 30/40MVA, 132/33KV Substation and Ohafia – Arochukwu 132KVA Line.

73.Okigwe 2 x 30/40 MVA, 132/33KV Substation.

74.Ongoing Ohafia 2 x 30 /40 MVA, 132/33KV Substation.

75.Umuahia – Ohafia 132KV Single – Circuit Line, Umuahia – Mbalano 132KV Line, Ohafia – Arochukwu 132KV Line.

76.Rehabilitation and Re – opening of the NNPC depot at Aba after 6years of closure.

77.Rehabilitation and Construction of Goodluck Jonathan Barrack in Ohafia
.
78.Establishment of Abia State Office of the National Productivity Centre.

79.Rehabilitation of Agricultural Skills Training Centre.

80.NDDC – Obehia – Azumini – Ukanafun Road (Abia – Akwa Ibom) Roads Projects.

81.Construction of a storey building for 136 Inmates at Aba Prison.